-
Tank and piping installation
It has the second-level qualification of general contracting of mechanical and electrical installation, petrochemical engineering construction, and the qualification of professional contracting enterprise of anti-corrosion and thermal insulation engineering, and its business covers the construction of storage tanks and process pipelines such as spherical tanks and floating roof tanks, and has successively undertaken a series of engineering projects such as Dongjiakou Mercuri Reservoir Area, Weifang Tank Farm, Guangrao Tank Farm, Dongjiakou Commercial Storage, Lianyungang Shengheng Petrochemical Pipeline, Rizhao Lanshan Jingbo Pipeline, etc.
-
Steel Structure Engineering
Business scope: culvert pipe gallery steel structure, steel approach bridge, pipe belt machine steel structure, belt conveyor steel structure, wharf supporting steel structure, steel approach bridge, equipment steel structure, etc.
It has successively undertaken the construction of the steel structure pipe gallery of the second phase of the crude oil terminal in the west port area of Yantai Port, the steel structure pipe gallery of the liquid bulk cargo operation area of the port area of Binzhou Port, the pipe gallery project of the 20,000-ton/5,000-ton liquid bulk cargo terminal supporting tank farm in the central area of Lanshan Port Area of Rizhao Port, the first phase of the Lanshan oil and gas public pipe gallery project, the 300,000-ton steel approach bridge project of the Lanshan liquid chemical terminal, the steel structure pipe gallery project of the RB11R project of Asia Symbol Pulp and Paper Co., Ltd., and the PM14 project of Asia Symbol Pulp and Paper Co., Ltd TG4 section pipe gallery steel structure and other series of engineering projects.
-
Tank cleaning, anti-corrosion, maintenance
In accordance with the national or petrochemical industry corresponding to the mechanized cleaning technology, anti-corrosion technology, maintenance technical specifications, standards, and operation requirements of the petroleum storage tank, the tank is waterless and slag-free after cleaning, and the coating appearance is smooth and uniform after anti-corrosion, no bubbles, no flow, no leakage, and the standard height of the water test is 17.5 meters, and the static pressure is maintained for 48 hours, and the pass rate of the unit project is 100%, which meets the national acceptance standards.